Highlights
Of Marisoft Phase - II & III
|
|
1.
|
Flat slab construction with clear headroom of 3.3 m. |
|
2.
|
Paved
covered parking @ rate of 2 car park per 1000 sq.ft. |
|
3.
|
15
passengers automatic Schindler smart lifts. |
|
4.
|
Proposed
sewage treatment plant of 2 lakh lit / day. Recycled water to be
used for cooling towers, gardens irrigation & flushing of toilets.
|
|
5.
|
Exclusive
entrance lobby.
|
|
6.
|
Separate
ladies & gents toilet on each floor. |
|
7.
|
Space
for cafeteria on each floor. |
|
8.
|
Space
for AHU units, UPS, batteries & electrical room. |
|
9.
|
2
Nos of fire escape staircase. |
|
10.
|
Wet
riser fire fighting system. |
|
11.
|
Refuse
area at 24 m level from the road level. |
|
12.
|
Structural
glazing for exteriors. |
|
13.
|
Landscape
garden with irrigation system. |
|
14.
|
Landscape
garden with irrigation system. |
|
15.
|
Plastic
emulsion paint for interior & Luster paint for entrance lobby.
|
|
16.
|
Tyrrolene
finish rough plaster for external walls with weatherproof decorative
paint. |
|
17.
|
Proposed
22/11 KVA, 5 MVA substation dedicated to Marigold Premises to avoid
frequent load shedding, automatic voltage regulator upto +_ 10%
Thus power quality at complex would be superior & stable. |
|
18.
|
Proposed
underground 11 KVA ring main units to further increases the reliability
within the Marigold township. |
|
19.
|
100%
generator back-up for lifts, common lightings & water pumps.
|
|
20.
|
Mini
network unit for Telecommunications system installed by Huges Ispat
& BSNL. Presently it can cater to 1000 lines each for data lines,
E1 data circuit & voice. |
|
21.
|
Provision
for Dish antenna & Communication system tower on terrace. |
|
22.
|
6"
dia PMC water connection is laid for complex. |
|
23.
|
24
hrs security for the complex. |